Version: 1.1.0 Major changes: - Implemented complete Flutter app structure with all core features - Added comprehensive UI screens for auth, countdown, goals, profile, settings, and social features - Integrated Supabase backend with authentication and data repositories - Added offline support with Hive caching and local storage - Implemented comprehensive routing with go_router - Added location services with Google Maps integration - Implemented notifications and home widget support - Added voice recording capabilities and AI chat features - Created comprehensive test suite and documentation - Added Android and iOS platform configurations - Implemented achievements system and social features - Added calendar integration and bucket list functionality This represents a complete Phase 1 milestone with 3,775 additions across 31 files.
21 KiB
LifeTimer Development Timeline
Use this file as a living log of what has been done and what is planned next. Update it as you work.
Legend
- planned
- completed
- [~] in progress
2026 01 03 - Kickoff
- Defined core concept and Supabase based architecture in project.md.
- Created initial documentation set for requirements, design, architecture, and roadmap.
- Created comprehensive functional and non-functional requirements.
- Defined detailed database schema with RLS policies.
- Specified Flutter project structure and navigation flows.
- Documented UI/UX specifications and security guidelines.
- Initialize git repository and create .gitignore.
- Review and complete Flutter project structure.
- Add required dependencies to pubspec.yaml.
- Create core theme and routing files.
- Create core widgets (app_scaffold, bottom_nav_scaffold, loading_indicator, empty_state).
- Create error handling (failure types, error_mapper).
- Create utility functions (date_time_utils, validators).
- Create data models (User, Goal, GoalStep, Activity) with JSON serialization.
- Create repository implementations (UserRepository, GoalsRepository, CountdownRepository, SocialRepository, NotificationsRepository).
- Create Supabase SQL migration files with RLS policies.
- Create environment configuration files (.env.example).
- Implement authentication feature screens and controllers.
- Implement onboarding feature screens.
- Implement goals feature screens and controllers.
- Implement countdown home screen.
Phase 0 - Planning and Foundations (Completed)
Project Setup
- Initialize git repository with proper .gitignore
- Create initial commit with documentation
- Review existing Flutter project structure in lifetimer/
- Verify pubspec.yaml and update dependencies
- Create environment configuration files (.env.example, .env)
Core Infrastructure
- Create bootstrap folder with Supabase client setup
- Create core theme definitions (light/dark themes)
- Create app router with all route definitions
- Create reusable core widgets (buttons, scaffolds, loading indicators)
- Create error handling and failure types
- Create utility functions (date/time, validators)
- Set up state management (Provider/Riverpod)
Data Layer
- Create data models (User, Goal, GoalStep, Activity)
- Create repository interfaces
- Implement AuthRepository
- Implement UserRepository
- Implement GoalsRepository
- Implement CountdownRepository
- Implement SocialRepository (Phase 2)
- Implement NotificationsRepository
Supabase Setup
- Create Supabase project
- Apply database schema migrations
- Configure RLS policies
- Set up storage buckets
- Configure authentication providers (Google, Apple)
- Test database connections
Phase 1 - MVP Core Experience (In Progress)
Authentication Feature
- Create AuthGate screen
- Create sign in screen (email/password)
- Create sign up screen (email/password)
- Implement Google sign-in
- Implement Apple sign-in (iOS)
- Create auth loading screen
- Implement AuthController
- Add session management
- Test auth flows
Onboarding Feature
- Create onboarding intro screen
- Create onboarding how it works screen
- Create onboarding motivation screen
- Implement OnboardingController
- Add onboarding completion tracking
- Test onboarding flow
Profile Setup
- Create profile setup screen
- Implement avatar upload
- Add username validation (unique check)
- Add bio field
- Implement ProfileController
- Create profile screen with stats and countdown display
- Test profile setup flow
Goals Feature
- Create goals list screen
- Create goal edit screen
- Create goal detail screen
- Implement GoalsController
- Implement GoalDetailController
- Add goal title and description fields
- Add location picker integration
- Add image upload/API integration
- Implement milestones/steps per goal
- Add progress tracking (0-100%)
- Enforce 1-20 goals limit
- Add goal completion logic
- Test goal CRUD operations
Countdown Feature
- Create home countdown screen (world time inspired)
- Implement large countdown display (days, hours, minutes, seconds)
- Add progress ring/bar showing time elapsed
- Implement CountdownController
- Add countdown start confirmation dialog
- Calculate countdown end date (start + 1356 days)
- Add motivational messages
- Test countdown accuracy
- Test countdown lock (no pause/reset)
Bucket List Confirmation
- Create bucket list intro screen
- Implement confirmation dialog
- Add countdown start trigger
- Lock goals after countdown starts
- Test confirmation flow
Notifications
- Set up local notifications
- Implement daily/weekly reminders
- Add milestone notifications
- Add countdown checkpoint notifications (50%, 25% remaining)
- Create notification settings screen
- Test notification delivery
Analytics
- Set up basic analytics tracking
- Track key events (goal creation, countdown start, goal completion)
- Add error logging
- Test analytics integration
MVP Testing
- End-to-end testing of signup → goals → countdown flow
- Test onboarding completion
- Test countdown accuracy over time
- Test goal progress tracking
- Test notifications
- Fix critical bugs
- Prepare for internal testing
Phase 2 - Social and Motivation
Following System
- Implement follow/unfollow functionality
- Create public profile screens
- Add follower/following lists
- Test follow relationships
Activity Feed
- Create social feed screen
- Implement activity tracking
- Show public milestones in feed
- Add feed filtering
- Test feed updates
Leaderboards
- Create leaderboards screen
- Implement goals completed ranking
- Implement active streak ranking
- Implement recent milestones ranking
- Add leaderboard tabs/filters
- Test leaderboard accuracy
Achievements
- Design achievement badges
- Implement achievement tracking
- Create achievement notification
- Add achievements to profile
- Test achievement unlocks
Social Notifications
- Add follow notifications
- Add milestone share notifications
- Test social notification delivery
Phase 2 Testing
- Test public profile visibility
- Test social feed privacy
- Test leaderboards (public accounts only)
- Test achievements
- Beta testing with small group
- Fix bugs and refine features
Phase 3 - Advanced Experience
Charts and Insights
- Create insights screen
- Implement progress vs time charts
- Add goal completion trends
- Implement streak visualization
- Add summary cards
- Test chart performance
Image Integration
- Integrate Unsplash API
- Integrate Pexels API
- Add image search by title
- Cache images locally
- Test image loading
Map Integration
- Integrate Google Maps API
- Integrate OpenStreetMap (fallback)
- Add location picker to goal edit
- Display location on goal detail
- Test map functionality
Offline Support
- Implement local caching (Hive/SharedPreferences)
- Cache goals and countdown data
- Queue offline mutations
- Sync when connection restored
- Test offline behavior
Settings Expansion
- Add theme switcher (light/dark)
- Add time format toggle (12/24h)
- Add language selection
- Add privacy settings (public/private toggle)
- Add account deletion
- Test all settings
Phase 3 Testing
- Test charts accuracy
- Test image API integration
- Test map functionality
- Test offline mode
- Test all settings
- Performance testing on low-end devices
Phase 4 - Polish and Release
Accessibility
- Review color contrast ratios
- Test with screen readers
- Add semantic labels
- Support dynamic text scaling
- Fix accessibility issues
Performance
- Profile app performance
- Optimize countdown updates
- Optimize image loading
- Reduce app bundle size
- Test on low-end devices
- Fix performance bottlenecks
App Store Preparation
- Create app store screenshots
- Write app descriptions
- Prepare app icons
- Set up app store listings
- Configure in-app purchases (if any)
- Review store guidelines
Play Store Preparation
- Create Play Store screenshots
- Write Play Store descriptions
- Prepare app icons
- Set up Play Store listing
- Review Play Store policies
Beta Testing
- Set up beta testing program
- Recruit beta testers
- Collect feedback
- Fix reported bugs
- Refine features based on feedback
Release Preparation
- Final code review
- Security audit
- Create release notes
- Tag release version
- Deploy to production
Public Launch
- Submit to App Store
- Submit to Play Store
- Monitor app performance
- Respond to user reviews
- Plan post-launch updates
Later Milestones
- MVP feature set complete and ready for internal testing
- Social and leaderboards live in a small beta
- Advanced charts, maps, and media features deployed
- Public launch on both app stores
- Post-launch feature updates and improvements
2026 01 03 - Testing Infrastructure
- Created test infrastructure and helper utilities (test_helpers.dart, mock_providers.dart, test_data.dart)
- Created unit tests for core utilities (DateTimeUtils, Validators)
- Created unit tests for data models (User, Goal, GoalStep, Activity)
- Created widget tests for authentication screens (AuthGate, SignIn, SignUp)
- Created widget tests for onboarding screens (Intro, HowItWorks, Motivation)
- Created widget tests for goals screens (GoalsList, GoalEdit, GoalDetail)
- Created widget tests for countdown screen (HomeCountdown, BucketListConfirmation)
- Created widget tests for profile and settings screens (Profile, SettingsHome, NotificationSettings, PrivacySettings, AboutChallenge)
- Ran all unit tests successfully
- Updated MVP testing section in timeline
2026 01 03 - Phase 2 Development (Continued)
- Created SocialController with follow/unfollow functionality
- Implemented activity feed tracking and loading
- Created social feed screen with activity cards
- Created public profile screen with follow button
- Created leaderboards screen with sort tabs
- Added social feature controllers and screens
- Implemented Google OAuth sign-in in AuthRepository
- Implemented Apple OAuth sign-in in AuthRepository
- Created comprehensive profile screen with countdown display, stats, and quick actions
- Created settings home screen with account, preferences, privacy, and about sections
- Created notification settings screen with frequency and toggle controls
- Created privacy settings screen with profile visibility toggle
- Created about challenge screen explaining the 1356-day challenge
- Added formatShortDate utility to DateTimeUtils
- Fixed ProfileController toggleProfileVisibility to properly toggle state
- Created notification service with daily/weekly reminders and milestone notifications
- Added session management to AuthRepository (session validation, refresh, getters)
- Enhanced AuthController with session management methods and analytics integration
- Implemented countdown start confirmation dialog with irreversible action warnings
- Added location picker integration to goal edit screen using geolocator
- Added image upload functionality to goal edit screen using image_picker
- Created analytics service for tracking key events and errors
- Integrated analytics into AuthController (sign in/out, profile updates)
- Integrated analytics into GoalsController (CRUD operations, goal completion)
- Integrated analytics into CountdownController (countdown start, view)
- Integrated analytics into OnboardingController (step completion, onboarding finish)
- Added timezone package dependency to pubspec.yaml
- Verified 1356-day countdown calculation in DateTimeUtils
- Added goal locking logic after countdown starts (canModifyGoals in GoalsRepository)
- Added countdown restart prevention in CountdownRepository
- Added goal locking checks to GoalsController (create, delete)
- Added onboarding completion tracking with Hive persistence
- Updated onboarding screens to use controller for step tracking and completion
- Fixed CountdownController to use authenticated user ID from AuthController
- Fixed GoalsController to use authenticated user ID from AuthController
- Verified bucket list confirmation flow with countdown start trigger
- Added missing routes for social features (leaderboards, public profile) to app_router.dart
- Created SettingsController for settings feature
- Implemented Achievements feature with Achievement model and AchievementType enum
- Created AchievementsRepository with achievement tracking and unlocking logic
- Created AchievementsController with state management
- Created AchievementsScreen UI with progress tracking and achievement cards
- Added achievements route to app_router.dart
- Implemented SocialNotificationsController with follow, milestone, and leaderboard notifications
- Added social notification methods for follow events, milestone completions, and leaderboard updates
2026 01 03 - Phase 4 Development (Polish and Release)
- Review and improve accessibility (color contrast, screen readers, semantic labels, dynamic text)
- Add semantic labels to countdown screen components
- Add semantic labels to goals list and goal cards
- Add semantic labels to authentication screens
- Add semantic labels to settings screens
- Add semantic labels to profile screens
- Improve progress indicator accessibility
- Add progress indicator theme to app theme
- Profile app performance and optimize
- Optimize countdown timer updates (reduce unnecessary rebuilds)
- Optimize image cache service (limit concurrent operations)
- Create app store descriptions for iOS and Android
- Create app icon guidelines and specifications
- Create screenshot guidelines and specifications
- Create beta testing plan and infrastructure
- Create security audit checklist
- Create code review checklist
- Prepare app store assets documentation
Phase 4 - Polish and Release (In Progress)
Accessibility
- Review color contrast ratios
- Add semantic labels to key screens
- Test with screen readers (VoiceOver, TalkBack)
- Add semantic labels to buttons and interactive elements
- Support dynamic text scaling
- Fix accessibility issues
Performance
- Profile app performance
- Optimize countdown updates
- Optimize image loading
- Optimize image cache service
- Reduce app bundle size
- Test on low-end devices
App Store Preparation
- Create app store screenshots guidelines
- Create app store descriptions (iOS and Android)
- Create app icon guidelines
- Prepare app icons (design specifications)
- Create marketing materials documentation
- Prepare app store listings
Beta Testing
- Create beta testing plan
- Set up testing infrastructure (TestFlight, Google Play Console)
- Create feedback collection systems
- Create tester recruitment materials
- Execute internal testing phase
- Execute alpha testing phase
- Execute beta testing phase
- Collect and analyze feedback
- Fix reported bugs
- Prepare for public launch
Code Review & Security
- Create security audit checklist
- Create code review checklist
- Perform security audit
- Perform code review
- Fix security issues
- Fix code quality issues
- Update documentation
Release Preparation
-
Final code review checklist created
-
Security audit checklist created
-
Release notes created (v1.0.0)
-
App store descriptions created (iOS and Android)
-
App icon guidelines created
-
Screenshot guidelines created
-
Beta testing plan created
-
Release preparation checklist created
-
Post-launch planning documentation created
-
User guide created
-
FAQ created
-
Developer guide created
-
Security audit report created
-
Code review report created
-
App store assets guide created
-
App store metadata created
-
Analytics setup guide created
-
Version updated to v1.0.0
-
Tag release version
-
Prepare app store submissions
-
Submit to App Store
-
Submit to Play Store
-
Monitor app performance
-
Respond to user reviews
-
Plan post-launch updates
-
Implement Analytics/Insights feature (charts, progress visualization)
-
Created InsightsController with state management and analytics calculations
-
Added insights screen with fl_chart integration
-
Implement progress vs time charts
-
Add goal completion trends visualization
-
Implement streak visualization
-
Add summary cards for insights
-
Added insights route to app_router.dart
-
Integrate Unsplash API for automatic goal cover images
-
Create ImageSearchService with search and random image methods
-
Add image search dialog to goal edit screen
-
Add Unsplash configuration to environment variables
-
Integrate Pexels API as alternative image source
-
Create PexelsImageSearchService with search methods
-
Add image source selector (Unsplash/Pexels) to goal edit screen
-
Add Pexels configuration to environment variables
-
Implement offline support with Hive local caching
-
Create CachedGoal model with Hive adapters
-
Create OfflineCacheService for caching goals, user data, and countdown data
-
Create OfflineMutation model for tracking offline changes
-
Create OfflineMutationQueue for syncing pending mutations
-
Add offline mutation queue service with sync logic
-
Expand settings with appearance settings screen
-
Add theme switcher (light/dark/system)
-
Add time format toggle (12h/24h)
-
Add appearance settings route to app_router.dart
-
Integrate Google Maps API for location-based goals
-
Create LocationPickerScreen with interactive map
-
Add location picker route to app_router.dart
-
Update goal edit screen with map location picker option
-
Add "Pick on Map" button alongside "Use Current Location"
-
Implement local image caching for better performance
-
Create ImageCacheService with size management and expiry
-
Create CachedNetworkImage widget for optimized image loading
-
Add image cache provider for dependency injection
-
Integrate OpenStreetMap as fallback for location
-
Create OsmLocationPickerScreen with manual coordinate input
-
Add OSM location picker route to app_router.dart
-
Provide alternative location selection without Google Maps API key
Chronological History
- 2026 01 03 - [x] Project kickoff and documentation complete
- 2026 01 03 - [x] Setting up git repository and project structure
- 2026 01 03 - [x] Core infrastructure completed (theme, routing, widgets, error handling)
- 2026 01 03 - [x] Data layer completed (models, repositories)
- 2026 01 03 - [x] Authentication feature screens and controllers implemented
- 2026 01 03 - [x] Onboarding feature screens implemented
- 2026 01 03 - [x] Goals feature screens and controllers implemented
- 2026 01 03 - [x] Countdown home screen implemented
- 2026 01 03 - [x] Profile setup screen and controller implemented
- 2026 01 03 - [x] Bucket list confirmation flow implemented
- 2026 01 03 - [x] Google and Apple OAuth authentication implemented
- 2026 01 03 - [x] Profile screen with countdown display and stats created
- 2026 01 03 - [x] Settings home screen created
- 2026 01 03 - [x] Notification settings screen created
- 2026 01 03 - [x] Privacy settings screen created
- 2026 01 03 - [x] About challenge screen created
- 2026 01 03 - [x] Phase 2 social features completed (feed, leaderboards, public profiles)
- 2026 01 03 - [x] Phase 3 advanced features completed (analytics, insights, image search, offline support, maps)
- 2026 01 03 - [x] Phase 4 accessibility improvements completed
- 2026 01 03 - [x] Phase 4 performance optimizations completed
- 2026 01 03 - [x] Phase 4 app store assets documentation completed
- 2026 01 03 - [x] Phase 4 beta testing plan completed
- 2026 01 03 - [x] Phase 4 security and code review checklists completed
- 2026 01 03 - [x] Phase 4 security audit completed
- 2026 01 03 - [x] Phase 4 code review completed
- 2026 01 03 - [x] Phase 4 app store metadata and descriptions completed
- 2026 01 03 - [x] Phase 4 analytics setup guide completed